Archon PR Review Context

How to incorporate archon's PR review output during code review.

Important: blis-pr-review does NOT run archon. It just reads archon output from a previous PR comment and incorporates the verdict.

Getting archon (for manual runs): Run scripts/archon-build.sh from the repo root. It builds the version pinned in .archon-version and prints the binary path. See archon README for verdict definitions and full examples.

What the comment contains

One comment per /archon-pr-review, in one of two shapes:

  • three views — component, witness delta, interface-contract
  • three views plus plan checks — the same, with ### G5 — Plan distance ratchet and a plan verdict appended

The second shape appears when the PR belongs to a planned multi-PR feature. Nothing here needs to know how CI decides that; if a section is present, read it.

Two lines may precede the review:

  • a note naming the plan the checks ran against, and the commit it came from. When that commit is the PR's own head it says the plan is not independently verified — expected on the final feature-branch-to-main PR, since main carries no plan.
  • a > [!WARNING] saying the plan check was skipped. The PR asked to be checked against a plan and was not, so there is no ratchet or verdict in that comment — treat it as missing evidence, not as a passing gate.

Verdicts

Verdict Meaning Reviewer action
FAST-TRACK No boundary moved Skip architecture concerns — focus on correctness
REALIZES Hole filled, dist decreased Confirm it matches the sub-issue's expected outcome
EXCEEDS Adds structure the plan didn't mention Ask: intentional? Plan update needed?
CONFLICTS Dist went up or disallowed dependency Block. Code is wrong or plan needs update.

How to incorporate during review

  1. Check if archon output exists in a previous PR comment (CI or manual)
  2. FAST-TRACK → no architectural concern, proceed with normal review
  3. REALIZES → verify dist reduction matches sub-issue expectation
  4. EXCEEDS/CONFLICTS → flag to maintainer, may need plan-update PR
  5. Plan check skipped (the warning above) → the dist gate did not run. Say so; do not read the comment as evidence the plan was satisfied.